The completion date is December 2024. After completion of the construction, the price will be 710,000.
Installment payment is possible.
The price includes:
Finishing of all walls and ceilings, including
plaster, putty and painting.
Granite flooring, walls
of bathrooms and toilets, walls of technical rooms.
Oak parquet in the bedrooms.
The facades of the building, stairs and parapets
are made of natural local stone.
Energy-efficient windows with aluminum
window blocks providing
panoramic views.
A complete set of plumbing fixtures, including earthenware from
Villeroy & Boch, chrome sink,
shower faucets and shower cabins.
Cooper Hunter Multi-split air conditioners
(Canada) for all residential premises
Lighting devices:
Street lights and lighting of technical
rooms, corridors and bathrooms.
Urban water supply.
Reserved water tank and water
pressure pumps.
Central hot water boiler with
hot water circulation.
The bioseptic system.
Vandal-proof entrance doors.
Interior doors made of wood and MDF.
IT and security systems:
Optical Internet access.
Fire protection system.
An intercom for communication.
Security alarm system.
Video surveillance.
Swimming pool
A fully equipped pool bowl with
mosaic decoration.
Pool equipment such as circulation with
water purification and purification, lighting and stairs.
Quartz glass water purification for swimming pools.